E&O claim review checklist

For hardware OEM operations, procurement and finance teams reviewing an excess and obsolete (E&O) inventory claim from a contract manufacturer. Use this checklist to prepare the evidence and questions for your review.

1. Define the scope before calculating

Record the supplier, site, project, claim date, currency and inventory categories. Agree which forecast revision and purchasing authorizations apply. Keep disputed assumptions visible rather than silently choosing the interpretation that gives the lowest claim.

  • Separate on-hand stock, open orders and cancellation fees.
  • Confirm units of measure and whether unit costs include other charges.
  • Preserve the original claim and identify the version under review.

2. Request the evidence package

Start with a line-level claim and the relevant forecast. Purchasing authorizations make the review stronger; inventory and mitigation records add context.

  • Claim: part number, quantity, unit cost, claimed value and category.
  • Forecast: part number, authorized demand, revision and date where available.
  • Purchasing: PO or authorization references, quantities and dates.
  • Inventory: on-hand and open-order records with dates and identifiers.
  • Mitigation: cancellations, returns, alternative use and supporting fee records.

See supported columns, file formats and calculation settings →

3. Check the imports and matches

A matching part number alone does not establish that two rows belong to the same authorization. Inspect supplier and project scope where available. Review duplicate rows, missing quantities, rejected rows and ambiguous matches before interpreting totals.

Keep a link back to the original file, sheet and row. A finding is easier to discuss when both teams can see the evidence it came from.

4. Review quantity support separately from liability

Compare the claimed quantity with the selected forecast and purchasing evidence using explicit assumptions. Investigate quantities above the supported scope, but do not treat that difference as automatic savings. Contract terms, later approvals and incomplete evidence may change the conclusion.

Also avoid counting one authorization independently against several claim lines. Review the combined scope, not just each row in isolation.

5. Separate findings from missing information

  • Potential excess: identify the calculation and the evidence needed to confirm or challenge it.
  • Missing evidence: request the specific document or quantity needed.
  • Review: resolve ambiguity, conflicts or assumptions that require judgment.
  • Supported quantity: check commercial terms and costs before accepting liability.

Finding categories may overlap. Do not add all category values together as a single savings number.

6. Prepare the supplier discussion

For each disputed line, record the claim, calculation, supporting rows, open question and owner. Export the review, retain its settings and note the supplier’s response. Track confirmed adjustments separately from amounts merely flagged by the tool.

Try the checklist on an example

Walk through a synthetic $600 claim with $100 of potential excess, or open the workspace and choose “Load demo example”.

For help evaluating your workflow, see the one-claim pilot scope. This checklist supports a commercial review; it is not an interpretation of your contract.